Porreres wastewater treatment plant has been extended in response to a need pending since 2007: to adapt the facilities to population growth, the Balearic Water Plan and the process of separating the networks. The works sought to improve wastewater treatment and prevent rainwater from entering the system.
Project to extend and remodel the Porreres WTP
Mallorca (Porreres)
Govern de les Illes Balears
Agència Balear de l'Aigua i la Qualitat Ambiental (ABAQUA)
ITS2016-016
2.662.000 €
2.662.000 €
2.317.683 €
2016
Executed
Environment
Executed: 87.07%
10.02.2022
The project supports farms in natural parks and heritage sites
Mallorca, Menorca, Ibiza, Formentera
500.000 €
Status: Executed
The deposit-return system designed by the Balearic Government aims to reduce waste and encourage recycling
Mallorca, Menorca, Ibiza, Formentera
500.000 €
Status: Executed
The project allows for two-way flow between Sa Marineta and s'Estremera and improves system control
Mallorca
439.230 €
Status: Executed