Porreres wastewater treatment plant has been extended in response to a need pending since 2007: to adapt the facilities to population growth, the Balearic Water Plan and the process of separating the networks. The works sought to improve wastewater treatment and prevent rainwater from entering the system.
Project to extend and remodel the Porreres WTP
Mallorca (Porreres)
Govern de les Illes Balears
Agència Balear de l'Aigua i la Qualitat Ambiental (ABAQUA)
ITS2016-016
2.662.000 €
2.662.000 €
2.317.683 €
2016
Executed
Environment
Executed: 87.07%
10.02.2022
New projects are driving agricultural innovation in the Balearic Islands
Mallorca, Menorca, Ibiza, Formentera
1.500.000 €
Status: Executed
An island-wide plan is promoting sustainability through businesses that offer craft products
Mallorca
600.000 €
Status: In execution
Municipality of Calvià set to expand its recycled water system for sustainable irrigation, with new connections and digital control
Mallorca
3.530.010 €
Status: Started