By way of this project the council aims to renew and extend the network of pipes for irrigation with reclaimed water from the Sa Coma wastewater treatment plant (WWTP), so that it can then maximise the use of reclaimed water. All of this will be ensured under optimal flow and pressure conditions, without interruptions.
Mallorca (Sant Llorenç des Cardassar)
Federació d'Entitats Locals de les Illes Balears
Ajuntament de Sant Llorenç des Cardassar
432.244 €
432.244 €
235.997 €
2023E
2023 - 2023
In execution
Environment
Executed: 54.6%
13.08.2025
This action is needed so the trees and all green areas in the coastal urban areas of the municipality of Sant Llorenç des Cardassar can be irrigated with reclaimed water. By the same token, it is also possible to use reclaimed water for street cleaning instead of relying on drinking water.
The project is in line with and contributes to the objectives of the annual Extraordinary Plan for the Promotion of Sustainable Tourism, specifically the priority objective outlined in Article 3(2.a): Protection, preservation, modernisation and recovery of the natural, rural, agricultural and marine environment.
Main objectives
With the project underway, the Sant Llorenç des Cardassar Town Council wants to:
It is worth noting that using reclaimed water for irrigation helps prevent an additional peak in drinking water consumption during the summer.
Description
The network laid out in this project begins at the junction of Calle Mare Selva and Avenida Palmeras and will serve the northern part of the urban area of Sa Coma.
It includes reclaimed water pipes in the urban area of Sa Coma, on Mare Selva, Garrover, Tamarell, Mimosas, and Eucalipto streets.
In total, the project will include 487 metres of PE-100 polyethylene piping with a nominal diameter of 200 mm and a nominal pressure of 10 bar, as well as 1,390 metres of PE-100 polyethylene piping with a nominal diameter of 160 mm and a nominal pressure of 10 bar.
Updating of the drinking water network and burying of infrastructures to improve the urban landscape in Moscari.
Mallorca
157.551 €
Status: Executed
Modernisation of irrigation systems already in place and expansion of new irrigation networks
Mallorca
2.075.347 €
Status: Executed
Renovation of water networks in 18 municipalities in Mallorca to optimise water management and guarantee a sustainable supply.
Mallorca
833.986 €
Status: Started