The complete restoration of the Can Fasser estate seeks to preserve its environmental and historical values and to convert the complex into a centre linked to Sa Dragonera Nature Park. The works, funded by the ITS fund, will start in 2025 and will be carried out in phases.
Mallorca (Andratx)
Federació d'Entitats Locals de les Illes Balears
Ajuntament d'Andratx
ITS2425-042
2.168.022 €
2.168.022 €
0 €
2024-2025
Not started
Environment
Executed: 0%
04.09.2025
Andratx Town Council has begun preparations to restore the Can Fasser estate, located in the Prat del Port wetlands, with the aim of transforming it into a space for educational, cultural and environmental use. The project is funded by the Sustainable Tourism Tax (ITS) and will run over the next few years, with a planned start date in 2025.
The intervention includes the recovery of the hydraulic system—with a noria (hydro-powered scoop wheel), irrigation ditches and cisterns—, the structural consolidation of the existing buildings and the adaptation of the spaces for use as exhibition halls, classrooms and laboratories linked to the natural environment. Plans also include the creation of an open-sided agricultural shelter and a system of access routes adapted to the site’s flood-prone topography.The new centre will be integrated into the network of facilities of Sa Dragonera Nature Park, acting as an educational entry point and a link between the cultural landscape of the Tramuntana Mountains and the agricultural heritage of the municipality. The estate retains traces of its livestock-farming past and preserves a traditional structure with marés-stone walls, an Arabic-tile roof and historic water channels.
In addition to the environmental and heritage value, the project seeks to generate social and urban benefits by revitalising a peripheral area, integrating it with the town centre and encouraging neighbourhood participation in educational and awareness-raising activities. The planned investment exceeds two million euros and the schedule is due to be completed in phases, with completion estimated in 2026.
Creation and dissemination of a computer application showing mooring areas in the Balearic Islands
Mallorca, Menorca, Ibiza, Formentera
774.821 €
Status: Executed
Construction of pipelines linking the municipalities of Petra and Manacor to ensure good supply conditions to populations lacking in water quality and quantity
Mallorca
515.146 €
Status: Executed
Action to be taken in areas of environmental relevance so as to guarantee safe and quality public usage
Mallorca, Menorca, Formentera
718.740 €
Status: In execution