Engineering works to renovate the Badia de Palma desalination plant are underway, following analysis and planning to determine how to adapt the facility to current production and energy efficiency needs.
Technical assistance to draw up the project and process the administrative procedures for the works to remodel the desalination in the Bay of Palma
Mallorca
Govern de les Illes Balears
Agència Balear de l'Aigua i la Qualitat Ambiental (ABAQUA)
ITS2019-146
464.501 €
464.501 €
257.612 €
2019
Executed
Environment
Executed: 55.46%
06.05.2024
The plan foresees 16 water points in critical areas to support firefighting operations
Mallorca, Menorca, Ibiza, Formentera
400.000 €
Status: In execution
Renovation of Menorca's water network to optimise water use, reduce losses and protect the natural environment.
Menorca
9.119.077 €
Status: In execution
A plan to improve water management and upgrade the pedestrian area in the tourist district
Formentera
484.000 €
Status: Executed