Engineering works to renovate the Badia de Palma desalination plant are underway, following analysis and planning to determine how to adapt the facility to current production and energy efficiency needs.
Technical assistance to draw up the project and process the administrative procedures for the works to remodel the desalination in the Bay of Palma
Mallorca
Govern de les Illes Balears
Agència Balear de l'Aigua i la Qualitat Ambiental (ABAQUA)
ITS2019-146
464.501 €
464.501 €
257.612 €
2019
Executed
Environment
Executed: 55.46%
06.05.2024
Ibiza Town Council is installing solar panels and charging points for electric vehicles in Es Gorg with support from the ITS fund
Ibiza
1.670.003 €
Status: Started
€2,000 of financial incentives for those who hand over old vehicles
Mallorca, Menorca, Ibiza, Formentera
2.000.000 €
Status: In execution
An action plan to restore ecological integrity and strengthen the conservation of fragile ecosystems
Mallorca, Menorca, Ibiza, Formentera
332.210 €
Status: Executed