A landscape integration project in El Molinar (Palma) aims improve connectivity across the cycling network, restore the surroundings of the Gros Stream and revive nearby heritage assets. Although it was scheduled to run from 2019 to 2023, the project has been extended and is still pending implementation.
Landscape integration of heritage elements on the non-motorised highway network and the Torrent Gros wadi in Molinar district
Mallorca (Palma de Mallorca)
Consell Insular de Mallorca
Consell Insular de Mallorca
ITS2019-005
583.483 €
583.483 €
0 €
2019
In execution
Environment
Executed: 0%
24.03.2026
The project aims to tackle flooding, leaks and accessibility issues in the town centre
Mallorca
787.104 €
Status: Executed
Improvements to interpretation centres and accessible trails in protected areas on the Balearic Islands
Mallorca
2.392.000 €
Status: Started
More resources to remove plastic and waste from the Balearic coastline
Mallorca, Menorca, Ibiza, Formentera
3.225.154 €
Status: In execution