The remodelling of the Sóller drinking water treatment plant (DWTP) includes new disinfection systems and improves the chlorination of the municipal water tank. The aim of the plan is to ensure the quality of the water collected from the Torrent Major Stream before being distributed for human consumption.
Remodelling of the Sóller drinking water treatment station (ETAP) and the adaptation of the reservoir’s chlorinated system
Mallorca (Sóller)
Govern de les Illes Balears
Agència Balear de l'Aigua i la Qualitat Ambiental (ABAQUA)
ITS2016-019
285.460 €
285.460 €
233.467 €
2016
Executed
Environment
Executed: 81.79%
26.09.2023
IBANAT is to update key equipment for fire prevention and maintenance in natural areas
Mallorca, Menorca, Ibiza, Formentera
5.226.223 €
Status: In execution
New pipeline to connect the Artrutx plant with the Son Blanc water tank
Menorca
583.630 €
Status: Executed
The works complete a plan that had been unfinished since 2010, and improves the discharge to the sea
Menorca
736.837 €
Status: Executed