The remodelling of the Sóller drinking water treatment plant (DWTP) includes new disinfection systems and improves the chlorination of the municipal water tank. The aim of the plan is to ensure the quality of the water collected from the Torrent Major Stream before being distributed for human consumption.
Remodelling of the Sóller drinking water treatment station (ETAP) and the adaptation of the reservoir’s chlorinated system
Mallorca (Sóller)
Govern de les Illes Balears
Agència Balear de l'Aigua i la Qualitat Ambiental (ABAQUA)
ITS2016-019
285.460 €
285.460 €
233.467 €
2016
Executed
Environment
Executed: 81.79%
26.09.2023
Sewerage renovation in Es Ca Marí to improve water treatment and agricultural use of water
Formentera
1.250.000 €
Status: Started
The Formentera Council has adopted mooring regulations in a sensitive area to avoid ecological impact
Formentera
652.154 €
Status: Executed
Total repair of key infrastructure in Mallorca's water system
Mallorca
1.544.878 €
Status: Executed