Ibiza’s waste transfer station will be renovated to handle the growing demand of separate waste collection and to respond to the spike in waste generated in summer. The plan seeks to upgrade equipment, expand storage capacity and optimise operations in order to strengthen the island’s circular economy.
Remodelling project for Ibiza’s waste transfer station
Ibiza (Eivissa)
Consell Insular d'Eivissa
Consell Insular d'Eivissa
ITS2425-099
2.646.798 €
2.234.434 €
0 €
2024-2025
Not started
Environment
Executed: 0%
17.10.2025
Having run since 2003, Ibiza’s waste transfer station is a key infrastructure for handling the separate collection of paper, cardboard and glass. Over time, with more and more waste managed—especially in summer—the facilities have become outdated. This has led to plans for its total remodelling.
Total repair of key infrastructure in Mallorca's water system
Mallorca
1.544.878 €
Status: Started
Energy transition for a more sustainable management
Mallorca
310.970 €
Status: Executed
Forestry protection and consolidation
Mallorca, Menorca, Ibiza, Formentera
95.000 €
Status: Executed