Ibiza’s waste transfer station will be renovated to handle the growing demand of separate waste collection and to respond to the spike in waste generated in summer. The plan seeks to upgrade equipment, expand storage capacity and optimise operations in order to strengthen the island’s circular economy.
Remodelling project for Ibiza’s waste transfer station
Ibiza (Eivissa)
Consell Insular d'Eivissa
Consell Insular d'Eivissa
ITS2425-099
2.646.798 €
2.234.434 €
1.156.399 €
2024-2025
In execution
Environment
Executed: 51.75%
25.02.2026
Total repair of key infrastructure in Mallorca's water system
Mallorca
1.544.878 €
Status: Executed
A plan for more efficient water use in farming and fewer discharges to groundwater
Mallorca
2.075.347 €
Status: Executed
A plan to protect the sand dune system and biodiversity in this iconic area
Mallorca
810.000 €
Status: Executed