Ibiza’s waste transfer station will be renovated to handle the growing demand of separate waste collection and to respond to the spike in waste generated in summer. The plan seeks to upgrade equipment, expand storage capacity and optimise operations in order to strengthen the island’s circular economy.
Remodelling project for Ibiza’s waste transfer station
Ibiza (Eivissa)
Consell Insular d'Eivissa
Consell Insular d'Eivissa
ITS2425-099
2.646.798 €
2.234.434 €
1.156.399 €
2024-2025
In execution
Environment
Executed: 51.75%
25.02.2026
The project allows for two-way flow between Sa Marineta and s'Estremera and improves system control
Mallorca
439.230 €
Status: Executed
Construction of a new water tank improves water management on the island
Mallorca
3.267.000 €
Status: Executed
The National Park is improving infrastructure to protect its ecosystem
Mallorca
953.998 €
Status: In execution