The aim of the project is to define the installations necessary for temporary occupation in a maritime-terrestrial public place so as to organize the uncontrolled anchoring of boats in s'Estany des Peix throughout the year, which increases significantly during the summer season.
Regulation of boat anchoring in s'Estany des Peix
Formentera (Formentera)
Consell Insular de Formentera
Consell Insular de Formentera
ITS2018-111
652.154 €
652.154 €
524.633 €
2018
Executed
Environment
Executed: 80.45%
03.10.2023
Construction of three connections to enable reversibility of water in the Sa Marineta pipeline and the s’Estremera aquifer
Mallorca
439.230 €
Status: Executed
Improvement of the water supply system and lighting in the south section of Calle Mayor in Es Migjorn Gran
Menorca
493.262 €
Status: Executed
Construction project for the construction of a new rainwater collection tank and a new rainwater network in Eivissa
Ibiza
1.003.557 €
Status: Started