The main activities of the project are the construction of a new EBAR in the Port of Andratx, the reform of the discharge chamber of S'Arracó and conditioning of the access road to the same and, finally, the construction of new pipes of purified water and residual.
Terrestrial collectors and sewage pipes of the Andratx WTP
Mallorca (Andratx)
Govern de les Illes Balears
Conselleria de Medi Ambient i Territori
ITS2017-053
4.018.971 €
2.009.485 €
7.330 €
2017
In execution
Environment
Executed: 0.36%
27.02.2026