The two main drinking water tanks in Felanitx have structural losses that compromise water supply and lead to unaffordable waste. The local council has initiated technical works to repair and waterproof this infrastructure, with the aim of reducing the current volume of leaks, which is over 40%.
Improving the efficiency of the Felanitx water tanks
Mallorca (Felanitx)
Federació d'Entitats Locals de les Illes Balears
Ajuntament de Felanitx
ITSE2023-161
206.348 €
206.348 €
176.964 €
2023E
Executed
Environment
Executed: 85.76%
13.03.2026
Construction project for the construction of a new rainwater collection tank and a new rainwater network in Eivissa
Ibiza
1.003.557 €
Status: In execution
The purchase of this property in a key natural setting will connect trails and strengthen environmental management
Mallorca
6.770.000 €
Status: Executed
The scheme promotes generational turnover in the Balearic farming industry through direct grants
Mallorca, Menorca, Ibiza, Formentera
3.000.000 €
Status: In execution