With a budget of over €7.6 million, the Balearic Islands Symphony Orchestra Foundation is resuming work on its headquarters in Palma after several years of delays. The building, designed as an open-plan culture centre, will incorporate sustainability and digitalisation measures.
Mallorca (Palma de Mallorca)
Conselleria de Turisme, Cultura i Esports
Fundació Orquesta Simfònica de les Illes Balears (FOSIB)
ITS2425-043
15.888.366 €
7.547.000 €
0 €
2024-2025
Not started
Destination Improvement
Executed: 0%
22.08.2025
Located on Calle Brotad in Palma, the building that will house the future headquarters of the Balearic Islands Symphony Orchestra Foundation is starting to see progress after the project came to a halt to undergo changes. The building, which will be used for cultural and administrative purposes, aims to be a versatile space for rehearsals, concerts and stage performances, with ties to the local area and the future ‘Parque de la Música’.
The revised project includes measures to improve the original features: from trapping solar energy to recycling rainwater for irrigation, parking with electric charging points and universal accessibility. High-tech facilities for recording, video projection and broadcasting of events are also foreseen.
The work includes the reorganisation of spaces such as the main rehearsal room, the creation of a physiotherapy room for musicians and specific areas for audio editing. Outside, the building will blend with the urban environment and outdoor concerts may be a possibility in the future.
With an execution budget of €7.6 million, the project has an estimated completion time of 14 months. The initiative is promoted by the foundation itself, and the public engineering company TRAGSATEC is also providing technical assistance. The relaunching of the project is part of a broader strategy to strengthen the role of culture as a driver of social cohesion and sustainability in the area.
A three-year plan will promote circularity, energy efficiency and digitalisation in the tourism industry
Mallorca, Menorca, Ibiza, Formentera
5.000.000 €
Status: Started
Design and building of a multi-purpose exhibition centre in Palma, in line with sustainability, accessibility and connectivity
Mallorca
1.004.850 €
Status: Not started
Provision of basic infrastructures for rehearsals of the Balearic Islands Symphony Orchestra
Mallorca
1.000.000 €
Status: Executed