Felanitx faces a critical situation with its water infrastructure, marked by a high percentage of water losses that compromises the quality of the service. This project aims to repair the two main water tanks in the town centre to improve their watertightness and solve structural problems. This intervention will ensure a more efficient and sustainable supply and reduce waste of this key resource.
Improving the efficiency of the Felanitx water tanks
Mallorca (Felanitx)
Federació d'Entitats Locals de les Illes Balears
Ajuntament de Felanitx
ITSE2023-161
206.348 €
206.348 €
176.964 €
2023E
Executed
Environment
Executed: 85.76%
13.03.2026
The design for the complete renovation of Mallorca’s main osmosis plant has been finalised
Mallorca
464.501 €
Status: Executed
A plan to protect the sand dune system and biodiversity in this iconic area
Mallorca
810.000 €
Status: Executed
An island-wide plan is promoting sustainability through businesses that offer craft products
Mallorca
600.000 €
Status: In execution